CORC

浏览/检索结果: 共3条,第1-3条 帮助

已选(0)清除 条数/页:   排序方式:
A drum-buffer-rope based scheduling method for semiconductor manufacturing system 会议论文
作者:  Cao, Zhengcai;  Peng, Yazhen;  Wang, Yongji
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/10
Re-entrant manufacturing system scheduling based on Drum-Buffer-Rope 期刊论文
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 卷号: 16, 期号: [db:dc_citation_issue], 页码: 2668-2673
作者:  Cao, Zheng-Cai;  Peng, Ya-Zhen;  Wu, Qi-Di
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/10
The analysis of service station allocation in the hospital based on bottleneck model 期刊论文
International Journal of Services, Technology and Management, 2009, 卷号: 12, 期号: 2, 页码: 231-251
作者:  Wu, F.;  Jia, T.;  Liu, S.L.;  Qi, J.Y.
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/18


©版权所有 ©2017 CSpace - Powered by CSpace