CORC  > 西安交通大学
A drum-buffer-rope based scheduling method for semiconductor manufacturing system
Cao, Zhengcai; Peng, Yazhen; Wang, Yongji
2011
关键词Drum-buffer-rope Equipment control Large amounts Relative loads Resource competitions Scheduling methods Semiconductor manufacturing systems Semiconductor wafer fabrication
期号[db:dc_citation_issue]
DOI[db:dc_identifier_doi]
页码120-125
会议录IEEE International Conference on Automation Science and Engineering
URL标识查看原文
ISSN号2161-8070
WOS记录号[DB:DC_IDENTIFIER_WOSID]
内容类型会议论文
URI标识http://www.corc.org.cn/handle/1471x/4499692
专题西安交通大学
推荐引用方式
GB/T 7714
Cao, Zhengcai,Peng, Yazhen,Wang, Yongji. A drum-buffer-rope based scheduling method for semiconductor manufacturing system[C]. 见:.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace