Analysis of Conspiracies between Contractors and Supervisors in Constructions | |
Zhao, L; Zhong, S | |
刊名 | FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6 |
2012 | |
卷号 | Vol.121-126页码:4386-4390 |
关键词 | Construction Contractor Supervisor Conspiracy Principal-agent model |
ISSN号 | 1660-9336 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/1868164 |
专题 | 四川大学 |
作者单位 | Sichuan Univ, Sch Management, Chengdu 610064, Sichuan, Peoples R China |
推荐引用方式 GB/T 7714 | Zhao, L,Zhong, S. Analysis of Conspiracies between Contractors and Supervisors in Constructions[J]. FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6,2012,Vol.121-126:4386-4390. |
APA | Zhao, L,&Zhong, S.(2012).Analysis of Conspiracies between Contractors and Supervisors in Constructions.FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6,Vol.121-126,4386-4390. |
MLA | Zhao, L,et al."Analysis of Conspiracies between Contractors and Supervisors in Constructions".FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE II, PTS 1-6 Vol.121-126(2012):4386-4390. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论