CORC

浏览/检索结果: 共107条,第1-10条 帮助

已选(0)清除 条数/页:   排序方式:
Resource Leveling in Projects with Stochastic Minimum Time Lags 期刊论文
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 卷号: 145, 期号: 4
作者:  Li, Hongbo;  Wang, Meng;  Dong, Xuebing
收藏  |  浏览/下载:19/0  |  提交时间:2019/08/22
Resource Leveling in Projects with Stochastic Minimum Time Lags 期刊论文
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 卷号: 145
作者:  Li, Hongbo[1];  Wang, Meng[2];  Dong, Xuebing[3]
收藏  |  浏览/下载:9/0  |  提交时间:2019/04/22
The Interaction Between Critical Chain Sequencing, Buffer Sizing, and Reactive Actions in a CC/BM Framework 期刊论文
Asia-Pacific Journal of Operational Research, 2019, 卷号: Vol.36 No.3, 页码: 1950010
作者:  Hu, XJ;  Wang, JJ;  Leng, KJ
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/13
Experimental Evaluation of Overlapping Strategy for the Multimode Resource-Constrained Project Scheduling Problem 期刊论文
ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2019, 卷号: 44, 页码: 2503-2517
作者:  Chu, Zihao;  Xu, Zhe;  Xie, Fang
收藏  |  浏览/下载:14/0  |  提交时间:2019/12/30
New heuristics for the RCPSP with multiple overlapping modes 期刊论文
COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 卷号: 131, 页码: 146-156
作者:  Chu, Zihao;  Xu, Zhe;  Li, Haitao
收藏  |  浏览/下载:12/0  |  提交时间:2019/12/30
A Genetic Algorithm for the Proactive Resource-Constrained Project Scheduling Problem With Activity Splitting 期刊论文
IEEE Transactions on Engineering Management, 2018
作者:  Ma, Zhiqiang;  He, Zhengwen;  Wang, Nengmin;  Yang, Zhen;  Demeulemeester, Erik
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/26
Proactive and reactive resource-constrained max-NPV project scheduling with random activity duration 期刊论文
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2018, 卷号: 69, 页码: 115-126
作者:  Zheng, Weibo;  He, Zhengwen;  Wang, Nengmin;  Jia, Tao
收藏  |  浏览/下载:7/0  |  提交时间:2019/11/26
Metaheuristic Algorithms for Proactive and Reactive Project Scheduling to Minimize Contractor's Cash Flow Gap under Random Activity Duration 期刊论文
IEEE ACCESS, 2018, 卷号: 6, 页码: 30547-30558
作者:  Ning, Minjing;  He, Zhengwen;  Wang, Nengmin;  Liu, Renjing
收藏  |  浏览/下载:3/0  |  提交时间:2019/11/26
Multi-mode resource leveling in projects with mode-dependent generalized precedence relations 期刊论文
EXPERT SYSTEMS WITH APPLICATIONS, 2018, 卷号: 97, 页码: 193-204
作者:  Li, Hongbo[1];  Dong, Xuebing[2]
收藏  |  浏览/下载:6/0  |  提交时间:2019/04/24
An Effective Solution Approach to Fuzzy Programming with Application to Project Scheduling 期刊论文
INTERNATIONAL JOURNAL OF FUZZY SYSTEMS, 2018, 卷号: 20, 页码: 2383-2398
作者:  Zhang, Qianyu[1];  Zhou, Jian[2];  Wang, Ke[3];  Pantelous, Athanasios A.[4]
收藏  |  浏览/下载:9/0  |  提交时间:2019/04/22


©版权所有 ©2017 CSpace - Powered by CSpace