CORC

浏览/检索结果: 共21条,第1-10条 帮助

已选(0)清除 条数/页:   排序方式:
Scenario-based heuristic to two-stage stochastic program for the parallel machine ScheLoc problem 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 卷号: 57, 期号: 6, 页码: 1706-1723
作者:  Liu, Ming;  Liu, Xin;  Zhang, E.;  Chu, Feng;  Chu, Chengbin
收藏  |  浏览/下载:21/0  |  提交时间:2019/08/22
Optimising data-driven network under limited resource: a partial diversification approach 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 卷号: 57, 页码: 6875-6892
作者:  Wu, Dexiang;  Wu, Desheng Dash;  Kwon, Roy H.
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/30
Optimal Bidding Strategy of GENCOs with Volatile Wind Power and Battery Swapping Station 会议论文
作者:  Gong, Naiwei;  Luo, Xianjue;  Ma, Honglian;  Wang, Qi;  Chen, Danyang
收藏  |  浏览/下载:10/0  |  提交时间:2019/11/19
A multi-layer dispatch strategy of combined wind-storage systems considering optimization of battery units 期刊论文
Dianwang Jishu/Power System Technology, 2016, 卷号: 40, 期号: [db:dc_citation_issue], 页码: 3029-3037
作者:  Liu, Chunyang;  Wang, Xiuli;  Wu, Xiong
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Signal coordination models for long arterials and grid networks 期刊论文
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2016, 卷号: 71, 页码: 215-230
作者:  Zhang, Lihui;  Song, Ziqi;  Tang, Xiaojun;  Wang, Dianhai
收藏  |  浏览/下载:1/0  |  提交时间:2019/12/09
Economic dispatch model considering battery lifetime for microgrid 期刊论文
Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2015, 卷号: 35, 期号: [db:dc_citation_issue], 页码: 29-36
作者:  Liu, Chunyang;  Wang, Xiuli;  Liu, Shimin;  Zhu, Zhenpeng;  Wu, Xiong
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Robust Distribution Network Reconfiguration 期刊论文
IEEE TRANSACTIONS ON SMART GRID, 2015, 卷号: 6, 期号: [db:dc_citation_issue], 页码: 836-842
作者:  Lee, Changhyeok;  Liu, Cong;  Mehrotra, Sanjay;  Bie, Zhaohong
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Deadlock Prevention for Flexible Manufacturing Systems via Controllable Siphon Basis of Petri Nets 期刊论文
IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 卷号: 45, 期号: [db:dc_citation_issue], 页码: 519-529
作者:  Liu, Huixia;  Xing, Keyi;  Wu, Weimin;  Zhou, MengChu;  Zou, Hailin
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
Aggregated Hydro Unit Based Model for Short-term Hydro Generation Scheduling 会议论文
作者:  Zhai, Qiaozhu;  Xiao, Xun;  Li, Xuan
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/03
New reformulations for probabilistically constrained quadratic programs 期刊论文
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 卷号: 233, 页码: 550-556
作者:  Hsia, Yong;  Wu, Baiyi;  Li, Duan
收藏  |  浏览/下载:5/0  |  提交时间:2020/01/06


©版权所有 ©2017 CSpace - Powered by CSpace