CORC

浏览/检索结果: 共14条,第1-10条 帮助

已选(0)清除 条数/页:   排序方式:
Facile synthesis of 2D nitrogen-containing porous carbon nanosheets induced by graphene oxide for high-performance supercapacitors 期刊论文
Sustainable Energy and Fuels, 2018, 卷号: 2, 页码: 2494-2501
作者:  Zhang, Xu;  Fan, Qiuyu;  Zhao, Yingyuan;  Wang, Man;  Meng, Yulan
收藏  |  浏览/下载:18/0  |  提交时间:2019/11/26
Identification of anti-Gram-negative bacteria agents targeting the interaction between ribosomal proteins L12 and L10 期刊论文
2018, 卷号: 8, 期号: 5, 页码: 772-783
作者:  Wang, Weiwei;  Liu, Chao;  Zhu, Ningyu;  Lin, Yuan;  Jiang, Jiandong
收藏  |  浏览/下载:7/0  |  提交时间:2020/01/03
A Simple Two-Step Cloud Point Extraction Process for Removing Fluorescent Whitening Agents VBL in Industrial Wastewater and Recycling of Surfactant 期刊论文
WATER ENVIRONMENT RESEARCH, 2017, 卷号: 89, 期号: 3, 页码: 281-287
-
收藏  |  浏览/下载:1/0  |  提交时间:2019/12/24
An optimal scheduling algorithm on single-machine with two-agent and deteriorating jobs 期刊论文
Hsi-An Chiao Tung Ta Hsueh/Journal of Xi'an Jiaotong University, 2016, 卷号: 50, 页码: 9-14 and 82
作者:  Liu, Yuelei;  Feng, Zuren;  Ren, Xiaodong
收藏  |  浏览/下载:5/0  |  提交时间:2019/11/26
Due date assignment and scheduling on a single machine with two competing agents 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 卷号: 54, 页码: 1152-1169
作者:  Wang, Du-Juan;  Yin, Yunqiang;  Cheng, Shuenn-Ren;  Cheng, T. C. E.;  Wu, Chin-Chia
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/09
Two-agent single-machine scheduling to minimize the batch delivery cost 期刊论文
COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 卷号: 92, 页码: 16-30
作者:  Yin, Yunqiang;  Wang, Yan;  Cheng, T. C. E.;  Wang, Du-Juan;  Wu, Chin-Chia
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/09
Just-in-time scheduling with two competing agents on unrelated parallel machines 期刊论文
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2016, 卷号: 63, 页码: 41-47
作者:  Yin, Yunqiang;  Cheng, Shuenn-Ren;  Cheng, T. C. E.;  Wang, Du Juan;  Wu, Chin-Chia
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/09
A shuffled frog-leaping algorithm for hybrid flow shop scheduling with two agents 期刊论文
Expert Systems with Applications, 2015, 卷号: 42, 期号: 23, 页码: 9333-9339
作者:  Lei, Deming*;  Guo, Xiuping
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/04
Some due date determination scheduling problems with two agents on a single machine 期刊论文
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2015, 卷号: 168, 页码: 81-90
作者:  Wang, Du-Juan;  Yin, Yunqiang;  Xu, Jianyou;  Wu, Wen-Hsiang;  Cheng, Shuenn-Ren
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/09
双组分水性聚氨酯涂料的制备及性能研究 学位论文
2014, 2013
潘尹银
收藏  |  浏览/下载:6/0  |  提交时间:2016/01/13


©版权所有 ©2017 CSpace - Powered by CSpace