已选(0)清除
条数/页: 排序方式:
|
| Status of PIP-II 650 MHz Prototype Dressed Cavity Qualification 会议论文 Brazil, 2021 作者: G.V. Eremeev; D.J. Bice; C. Boffo; S.K. Chandrasekaran; S. Cheban 收藏  |  浏览/下载:4/0  |  提交时间:2022/01/18 |
| Preparation and Qualification of Jacketed SSR1 Cavities for String Assembly at Fermilab 会议论文 Vancouver, BC, Canada, 2018 作者: D. Passarelli; P. Berrutti; S.K. Chandrasekaran; J.P. Ozelis; M. Parise 收藏  |  浏览/下载:6/0  |  提交时间:2018/12/21 |
| Anti-Q-slope enhancement in high-frequency niobium cavities 会议论文 Vancouver, BC, Canada, 2018 作者: M. Martinello; S. Aderhold; S.K. Chandrasekaran; M. Checchin; A. Grassellino 收藏  |  浏览/下载:16/0  |  提交时间:2018/12/21 |
| Design and Test Results of the 3.9 GHz Cavity for LCLS-II 会议论文 Vancouver, BC, Canada, 2018 作者: N. Solyak; S. Aderhold; S.K. Chandrasekaran; C.J. Grimm; T.N. Khabiboulline 收藏  |  浏览/下载:11/0  |  提交时间:2018/12/21 |
| Development of Nb3Sn Coatings for Superconducting RF Cavities at Fermilab 会议论文 Vancouver, BC, Canada, 2018 作者: S. Posen; S.K. Chandrasekaran; O.S. Melnychuk; D.A. Sergatskov; B. Tennis 收藏  |  浏览/下载:30/0  |  提交时间:2018/12/21 |
| Design Strategy of the PIP-II Cryomodules 会议论文 Germany, 2019 作者: V. Roger; S.K. Chandrasekaran; D. Passarelli 收藏  |  浏览/下载:19/0  |  提交时间:2020/03/02 |
| Magnetic Field Induced by Thermo Electric Current in LCLS-II Cryomodules 会议论文 Germany, 2019 作者: G. Wu; S.K. Chandrasekaran 收藏  |  浏览/下载:0/0  |  提交时间:2020/03/02 |
| Upgrade of the Fermilab Spoke Test Cryostat for Testing of PIP-II 650 MHz 5-Cell Elliptical Cavities 会议论文 Germany, 2019 作者: A.I. Sukhanov; S.K. Chandrasekaran; B.M. Hanna; T.H. Nicol; J.P. Ozelis 收藏  |  浏览/下载:4/0  |  提交时间:2020/03/02 |
| Performance of the 650 MHz SRF Cavity Tuner for PIP II Project 会议论文 Germany, 2019 作者: Y.M. Pischalnikov; S.K. Chandrasekaran; S. Cheban; I.V. Gonin; T.N. Khabiboulline 收藏  |  浏览/下载:0/0  |  提交时间:2020/03/02 |