CORC

浏览/检索结果: 共8条,第1-8条 帮助

已选(0)清除 条数/页:   排序方式:
Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method 期刊论文
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 卷号: 88, 页码: 209-220
作者:  Li, B.;  Wang, Z. Z.
收藏  |  浏览/下载:6/0  |  提交时间:2019/12/02
Numerical study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method 期刊论文
Tunnelling and Underground Space Technology, 2019, 卷号: 88
作者:  Li, B.;  Wang, Z.Z.
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/05
Numerical analysis on the mechanical performance of supporting structures and ground settlement characteristics in construction process of subway station built by Pile-Beam-Arch method 期刊论文
2017, 卷号: 21, 页码: 1690-1705
作者:  Liu, Xinrong[1,2];  Liu, Yongquan[1,2];  Yang, Zhongping[1,2];  He, Chunmei[1,2]
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/28
PBA工法地铁车站下穿桥梁方案优化研究 期刊论文
2016, 2016
韦京; 王芳; 孙明志; Wei Jing; Wang Fang; Sun Mingzhi
收藏  |  浏览/下载:6/0
Internal force calculation and supporting parameters sensitivity analysis of side piles in the subway station excavated by Pile-Beam-Arch method 期刊论文
2016, 卷号: 56, 页码: 186-201
作者:  Liu, Xinrong[1,2];  Liu, Yongquan[1,2];  Qu, Wanbo[3];  Tu, Yiliang[1,2]
收藏  |  浏览/下载:3/0  |  提交时间:2019/11/28
Analysis on the Response of Ground Surface Settlement for a Metro Station during Construction Using the Pile-Beam-Arch (PBA) Method Subjected to Pore Pressure 期刊论文
GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, 卷号: 2016-January, 期号: 260, 页码: 243-250
作者:  Xu, Fei;  Li, Li-Ping;  Zhang, Qian-Qing;  Wang, Zhe-Chao;  He, Peng
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/16
Deformation monitoring and its control in a shallow-buried large-span tunnel constructed using the pile-beam-arch method 期刊论文
2009, 卷号: 31, 页码: 38-43
作者:  Qu, Wan-Bo[1];  Liu, Xin-Rong[1];  Huang, Rui-Jin[2];  Liu, Ming-Zhong[2]
收藏  |  浏览/下载:3/0  |  提交时间:2019/11/29
浅埋大跨洞桩隧道变形监测与控制分析 Deformation Monitoring and Its Control in a Shallow-buried Large-span Tunnel Constructed Using the Pile-Beam-Arch Method 期刊论文
2009, 卷号: 31, 页码: 38-43
作者:  
收藏  |  浏览/下载:2/0  |  提交时间:2019/11/28


©版权所有 ©2017 CSpace - Powered by CSpace