CORC

浏览/检索结果: 共7条,第1-7条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Instability Risk Assessment of Construction Waste Pile Slope Based on Fuzzy Entropy 期刊论文
AIP Conference Proceedings, 2018, 卷号: Vol.1967
作者:  Ma, Yong;  Xing, Huige;  Yang, Mao;  Nie, Tingting
收藏  |  浏览/下载:8/0  |  提交时间:2019/02/25
Comprehensive Risk Based Operational StatusAssessmentof Transmission Line 期刊论文
2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014
作者:  Wei, Zhen-bo;  Gong, Hui;  Jiang, Le;  Liu, Jun-yong;  Zhu, Guo-jun
收藏  |  浏览/下载:9/0  |  提交时间:2019/02/25
Vulnerable Branch Assessment of Power Grid Contains Double-fed Wind Farms 期刊论文
2014 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2014
作者:  Wang-Lan;  Li, HQ;  Chen, Z;  Xu, HQ;  IEEE
收藏  |  浏览/下载:2/0  |  提交时间:2019/02/28
Dynamic Risk Assessment of Power System Catastrophic Event Caused by Cascading Failure 期刊论文
2012 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2012
作者:  Xie, GB;  Zhen, C;  Xiao, XY;  IEEE
收藏  |  浏览/下载:4/0  |  提交时间:2019/02/25
The Fuzzy Comprehensive Assessment of Brand Competitiveness of Property Insurance Companies 期刊论文
Applied Mechanics and Materials, 2011, 卷号: Vol.55-57, 页码: 1489-1493
作者:  Song, SF;  Li, GJ;  Su, YS
收藏  |  浏览/下载:4/0  |  提交时间:2019/02/25
Design for General Performance Assessment System Based on Three-level Fuzzy Comprehensive Evaluation Model 期刊论文
2011 AASRI CONFERENCE ON ARTIFICIAL INTELLIGENCE AND INDUSTRY APPLICATION (AASRI-AIIA 2011), VOL 2, 2011, 页码: 156-159
作者:  Jiang, HL;  Xian, QK;  He, HP
收藏  |  浏览/下载:3/0  |  提交时间:2019/02/28
拉萨市地表水环境质量评价及管理研究 学位论文
: 四川大学, 2007
作者:  柳林安
收藏  |  浏览/下载:6/0  |  提交时间:2019/04/19


©版权所有 ©2017 CSpace - Powered by CSpace