CORC

浏览/检索结果: 共7条,第1-7条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Inventory Classification Management Strategy of Parts and Components Within Equipment MRO Enterprises 会议论文
2018 2ND INTERNATIONAL CONFERENCE ON ADVANCES IN MANAGEMENT SCIENCE AND ENGINEERING (AMSE 2018), 2018-01-01
作者:  Zhao, Guo-zhi;  Liu, Xiao-bing
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/02
Fuzzy rule based decision trees 期刊论文
PATTERN RECOGNITION, 2015, 卷号: 48, 页码: 50-59
作者:  Wang, Xianchang;  Liu, Xiaodong;  Pedrycz, Witold;  Zhang, Lishi
收藏  |  浏览/下载:19/0  |  提交时间:2019/12/09
Research and application on inventory strategy of spare parts based on inventory classification 会议论文
4th International Conference on Innovation and Management, Ube, JAPAN, 2007-01-01
作者:  Lv Qiang;  Liu Xiaobing;  Bai Zhaoyang;  Qiu Lipeng
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/27
A graphical method to construct a phylogenetic tree 期刊论文
INTERNATIONAL JOURNAL OF QUANTUM CHEMISTRY, 2006, 卷号: 106, 页码: 1998-2005
作者:  Wang, WP;  Liao, B;  Wang, T;  Zhu, W
收藏  |  浏览/下载:0/0  |  提交时间:2019/12/27
Fuzzy reliability analysis and concept evaluation for product development (ID : 4-040) 会议论文
13th International Conference on Industrial Engineering and Engineering Management, Shandong Univ, Weihai, PEOPLES R CHINA, 2006-01-01
作者:  Zhao Hong;  He Liping;  Hoyle, Christopher
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/27
Fault tree analysis based on fuzzy logic 会议论文
53rd Annual Reliability and Maintainability Symposium (RAMS), Orlando, FL, 2006-01-01
作者:  He, Li-Ping;  Huang, Hong-Zhong
收藏  |  浏览/下载:2/0  |  提交时间:2019/12/27
Assuring measure based fuzzy fault tree analysis of crane rope broken 会议论文
International Symposium on Safety Science and Technology, Shanghai, PEOPLES R CHINA, 2004-10-25
作者:  Wu, WD;  Liu, CS;  Huang, HZ
收藏  |  浏览/下载:2/0  |  提交时间:2020/01/02


©版权所有 ©2017 CSpace - Powered by CSpace