CORC

浏览/检索结果: 共3条,第1-3条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Resource continuity constraints in repetitive project scheduling 期刊论文
2013, 卷号: 10, 页码: 5619-5628
作者:  Wang, Weixin[1];  Wang, Xu[1];  Ge, Xianlong[2];  He, Yandong[1]
收藏  |  浏览/下载:2/0  |  提交时间:2019/11/29
Analysis on the Vehicle Scheduling Model with time Window 会议论文
Chengdu, PEOPLES R CHINA, MAR 25-27, 2010
作者:  Yun, Lin[1];  Xianlong, Ge[1];  ChaoChun, Shi[1]
收藏  |  浏览/下载:0/0  |  提交时间:2019/11/30
RETRACTED ARTICLE: Research on the performance evaluation of logistic service supply chain based on analytic hierarchy process 会议论文
作者:  Hu, Chen[1,2];  Xianlong, Ge[3]
收藏  |  浏览/下载:0/0  |  提交时间:2019/11/30


©版权所有 ©2017 CSpace - Powered by CSpace