已选(0)清除
条数/页: 排序方式:
|
| The Frascati Beam Test Facility New Line: From Design to Beam Commissioning. 会议论文 Korea, 2021 作者: C. Di Giulio; B. Buonomo; F. Cardelli; D. Di Giovenale; L.G. Foggetta 收藏  |  浏览/下载:19/0  |  提交时间:2022/02/08 |
| SABINA: A Research Infrastructure at LNF 会议论文 Brazil, 2021 作者: L. Sabbatini; D. Alesini 收藏  |  浏览/下载:4/0  |  提交时间:2022/01/18 |
| DAΦNE Commissioning for SIDDHARTA-2 Experiment 会议论文 Brazil, 2021 作者: C. Milardi; D. Alesini; O.R. Blanco-García; M. Boscolo; B. Buonomo 收藏  |  浏览/下载:7/0  |  提交时间:2022/01/18 |
| Brazing free RF Pulse Compressor for High Gradient Accelerators 会议论文 Brazil, 2021 作者: L. Kankadze; D. Alesini; F. Cardelli; G. Di Raddo; M. Diomede 收藏  |  浏览/下载:5/0  |  提交时间:2022/01/18 |
| Beam Commissioning of the New 160 MeV H⁻ Injection System of the CERN PS Booster 会议论文 Brazil, 2021 作者: E. Renner; S.C.P. Albright; F. Antoniou; F. Asvesta; H. Bartosik 收藏  |  浏览/下载:3/0  |  提交时间:2022/01/18 |
| The Extended Operative Range of the LNF LINAC and BTF Facilities 会议论文 Brazil, 2021 作者: L.G. Foggetta; M. Belli; B. Buonomo; F. Cardelli; R. Ceccarelli 收藏  |  浏览/下载:4/0  |  提交时间:2022/01/18 |
| New Generation CERN LHC Injection Dump - Assembly and Installation (TDIS) 会议论文 Brazil, 2021 作者: D. Carbajo Perez; E. Berthomé; C. Bertone; N. Biancacci; C. Bracco 收藏  |  浏览/下载:3/0  |  提交时间:2022/01/18 |
| CERN BDF Prototype Target Operation, Removal and Autopsy Steps 会议论文 Brazil, 2021 作者: R. Franqueira Ximenes; O. Aberle; C. Ahdida; P. Avigni; M. Battistin 收藏  |  浏览/下载:6/0  |  提交时间:2022/01/18 |
| Towards the Last Stages of the CERN’s AD-Target Area Consolidation Project and Recommissioning Plans to Resume Operation 会议论文 Brazil, 2021 作者: C. Torregrosa; C. Ahdida; A. Bouvard; A. Broche; S. Burger 收藏  |  浏览/下载:6/0  |  提交时间:2022/01/18 |
| Design of an X-Band LLRF System for TEX Test Facility at LNF-INFN 会议论文 Brazil, 2021 作者: L. Piersanti; D. Alesini; M. Bellaveglia; S. Bini; B. Buonomo 收藏  |  浏览/下载:3/0  |  提交时间:2022/01/18 |