CORC

浏览/检索结果: 共3条,第1-3条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
The Planning and Evaluation Method of Power System Reserve Capacity Considering Risk Assessment 会议论文
作者:  Sun Jibo;  Wang Yanwei;  Yang Yinguo;  Jiang Jiangfeng;  Liu Fang
收藏  |  浏览/下载:2/0  |  提交时间:2019/11/26
Long-term reserve requirements planning and decision-making based on a conditional cost/benefit analysis 期刊论文
Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2014, 卷号: 34, 期号: [db:dc_citation_issue], 页码: 5642-5650
作者:  Qu, Chong;  Wang, Xiuli;  Zeng, Pingliang;  Xie, Shaoyu
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
Maintenance reserve capacity evaluation considering uncertainty of maintenance demands for power system 期刊论文
Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2014, 卷号: 34, 期号: [db:dc_citation_issue], 页码: 144-149
作者:  Zheng, Xiubo;  Zhang, Yongkai;  Bie, Zhaohong;  Lin, Yong
收藏  |  浏览/下载:7/0  |  提交时间:2019/12/02


©版权所有 ©2017 CSpace - Powered by CSpace