CORC

浏览/检索结果: 共5条,第1-5条 帮助

限定条件                
已选(0)清除 条数/页:   排序方式:
Optimizing the Probabilistic Spinning Reserve for the Interconnected System: Approximate Expected Energy Not Supplied using a Piecewise Linearization Method 会议论文
作者:  Yao, Li;  Wang, Xiuli;  Zhang, Yue;  Wang, Yifei
收藏  |  浏览/下载:4/0  |  提交时间:2019/11/19
Influence of information system on microgrid operation reliability 期刊论文
Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2016, 卷号: 40, 期号: [db:dc_citation_issue], 页码: 28-35
作者:  Zhang, Tianyu;  Luo, Fengzhang;  Wang, Chengshan;  Wang, Xiaoyu;  Jin, Zikai
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
Transmission lines de-icing optimal scheduling considering system risk 期刊论文
Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2014, 卷号: 34, 期号: [db:dc_citation_issue], 页码: 6101-6108
作者:  Hou, Yushen;  Wang, Xiuli;  Duan, Jie;  Guo, Jingli
收藏  |  浏览/下载:16/0  |  提交时间:2019/12/02
Impact of standby transmission components on the reliability of generation and transmission systems 期刊论文
Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2011, 卷号: 35, 期号: [db:dc_citation_issue], 页码: 5-9+19
作者:  Wu, Si;  Wang, Jianxue;  Lu, Jianming
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/10
Reliability evaluation of generation system based on probabilistic production simulation 期刊论文
Dianli Xitong Zidonghue/Automation of Electric Power Systems, 1999, 卷号: 23, 期号: 17
作者:  Xiuli, Wang;  Haoyong, Chen;  Zhi, Gan;  Xifan, Wan
收藏  |  浏览/下载:7/0  |  提交时间:2020/01/07


©版权所有 ©2017 CSpace - Powered by CSpace