CORC

浏览/检索结果: 共5条,第1-5条 帮助

限定条件    
已选(0)清除 条数/页:   排序方式:
Long-Term Optimal Scheduling of Cascade Hydropower Plants in the Primary Market: The Wujiang River Case 会议论文
WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2018: INTERNATIONAL PERSPECTIVES, HISTORY AND HERITAGE, EMERGING TECHNOLOGIES, AND STUDENT PAPERS, 2018-01-01
作者:  Cao, Rui;  Shen, Jian-Jian;  Zhu, Jiang;  Gao, Ying;  Miao, Shu-Min
收藏  |  浏览/下载:11/0  |  提交时间:2019/12/02
Optimization of variable-head hydropower system operation considering power shortage aspect with quadratic programming and successive approximation 期刊论文
ENERGY, 2018, 卷号: 143, 页码: 1020-1028
作者:  Niu, Wen-jing;  Feng, Zhong-kai;  Cheng, Chun-tian
收藏  |  浏览/下载:3/0  |  提交时间:2019/12/02
Day-Ahead Optimal Dispatching of Wind-Solar-Hydro-Thermal Combined Power System with Pumped-Storage Hydropower Integration 会议论文
作者:  Wang, Qi;  Luo, Xianjue;  Gong, Naiwei;  Ma, Honglian
收藏  |  浏览/下载:7/0  |  提交时间:2019/11/26
Short-Term Optimal Operation of a Wind-PV-Hydro Complementary Installation: Yalong River, Sichuan Province, China 期刊论文
Energies, 2018, 卷号: Vol.11 No.4, 页码: 868
作者:  Zhang, XS;  Ma, GW;  Huang, WB;  Chen, SJ;  Zhang, S
收藏  |  浏览/下载:2/0  |  提交时间:2019/02/25
Research on Short-term Optimization for Integrated Hydro-PV Power System Based on Genetic Algorithm 期刊论文
CLEANER ENERGY FOR CLEANER CITIES, 2018, 卷号: 152, 页码: 1097-1102
作者:  Liu, Luyao;  Sun, Qie;  Wang, Yu;  Liu, Yiling;  Wennersten, Ronald
收藏  |  浏览/下载:4/0  |  提交时间:2019/12/11


©版权所有 ©2017 CSpace - Powered by CSpace