Improved Evaluation Method of Major Hazard Installations | |
Zhang Hailong; Liu Jinzhong | |
2011 | |
会议名称 | 2011 IEEE International Conference on Mechatronics and Automation, ICMA 2011 |
会议日期 | August 7, 2011 - August 10, 2011 |
会议地点 | Beijing, China |
关键词 | Emergency Emergency Plan Evaluation Hazardous Installation Influencing Factors |
页码 | 2123-2128 |
通讯作者 | zhanghailong@uao.ac.cn |
英文摘要 | Combining major hazard installation with emergency plan, this paper proposes an improved evaluation model of major hazard installations. And we add influencing factors of emergency plan into the evaluation model. It is based on the data which is from some enterprise producing liquid chlorine and chlorethylene and works out the proposed model. Finally, we calculated and analyzed the damage, influenced range, loss of life and personal injury and economic loss. The calculation shows that the efficient emergency plan will reduce the accident possibility of major hazard installations. |
收录类别 | EI |
会议主办者 | IEEE Robotics and Automation Society; Beijing University of Technology; Kagawa University |
会议网址 | http://2011.ieee-icma.org/Home/Home.aspx |
会议录 | 2011 IEEE International Conference on Mechatronics and Automation, ICMA 2011 |
会议录出版者 | IEEE Computer Society |
会议录出版地 | Piscataway, NJ 08855-1331, United States |
学科主题 | 天文仪器、天文技术与数据 |
语种 | 英语 |
ISSN号 | 2152-7431 |
ISBN号 | 978-1-4244-8113-2 |
内容类型 | 会议论文 |
源URL | [http://ir.xao.ac.cn/handle/45760611-7/398] |
专题 | 新疆天文台_计算机技术室 新疆天文台_光学天文与技术应用研究室 |
通讯作者 | Zhang Hailong |
推荐引用方式 GB/T 7714 | Zhang Hailong,Liu Jinzhong. Improved Evaluation Method of Major Hazard Installations[C]. 见:2011 IEEE International Conference on Mechatronics and Automation, ICMA 2011. Beijing, China. August 7, 2011 - August 10, 2011.http://2011.ieee-icma.org/Home/Home.aspx. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论