中文摘要针对高切坡施工常常导致边坡失稳破坏,诱发滑坡发生的现象,提出采用超前支护桩整治不稳定高切坡的设计理论。采用解藕方法研究了超前支护桩与开挖坡体之间的相互作用机制,其中高切坡开挖面采用弹性理论分析;超前支护桩采用可以考虑桩侧向土体屈服的弹塑性理论进行桩的内力理论解,根据两者之间荷载变形关系建立联系求解,为高切坡超前支护桩的设计提供依据。结果表明:桩土相互作用力大于常规主动土压力,与边坡开挖量、开挖高度、支护桩的刚度以及土体性质等因亲密切相关。
英文摘要Slope failures or even landslides are often triggered by improper excavation in high slopes construct.The
pre-reinforced pile is presented to use to reinforced high cutting slope.In this paper,the interaction mechanism of
pile/soil is study according to uncouple method,the deformation of the high cutting is calculated using elastictheo,
ry,and the deform ation of the pre—reinforced pile is computed used elastic—plastic theory take account on,then to
build the equation groups according the load and deform ation relation.The analysis demonstrates that the respond of
pile/slope is controlled by cutting amount,high of slope,stiffness of pile as well as soil property,an d the distribu—
ted load along pile is more high than general active pressure.
分类号U418.55
资助信息国家自然科学基金项目(40572158)
语种中文
公开日期2010-07-21
内容类型期刊论文
源URL[http://ir.imde.ac.cn/handle/131551/1061]  
专题成都山地灾害与环境研究所_成都山地所知识仓储(2009年以前)
成都山地灾害与环境研究所_山地灾害与地表过程重点实验室
推荐引用方式
GB/T 7714
何思明. 高切坡超前支护桩与坡体共同作用分析[J]. 山地学报,2006,24(5):574-579.
APA 何思明.(2006).高切坡超前支护桩与坡体共同作用分析.山地学报,24(5),574-579.
MLA 何思明."高切坡超前支护桩与坡体共同作用分析".山地学报 24.5(2006):574-579.