泥石流预报中前期有效降水量的确定
韦方强; 胡凯衡
刊名山地学报
2005
卷号23期号:4页码:453-457
关键词泥石流 预报 前期降水量 有效降水量
其他题名Determination of Effective Antecedent Rainfall for Debris Flow Forecast
通讯作者韦方强
合作状况其它
中文摘要前期有效降水量是泥石流预报的重要参数之一,对不同类型泥石流的形成有不同的影响形式,对土力类泥石流的形成主要是影响泥石流形成区土体的土壤含水量.在每次前期降水增加的土壤含水量和其有效降水量遵循相同衰减规律,以及每次前期降水的有效降水量和其增加的土壤含水量衰减过程都是相互独立的假设条件下,通过分析土壤含水量随时间的变化关系,可以得到前期有效降水量与前期降水量随时间的变化关系,从而可以确定前期有效降水量.通过对云南蒋家沟降水和土壤含水量的实际观测,对这个关系进行了分析研究,并利用最小二乘法得出了前期有效降水量的计算公式.
英文摘要Effective antecedent rainfall (EAR), one of important factors for debris flow forecast, has different ways of influencing debris flow initiation for different types of debris flow. For soil-mechanics-typed debris flow, EAR impacts its initiation by changing the soil moisture content, and for hydromechanics-typed debris flow, EAR impacts its initiation by increasing the surface runoff. For this reason, the methods of determining EAR for different types of debris flows are different. The method for the former type of debris flow is discussed in this paper. Under the assumptions that soil moisture content due to antecedent rainfall decays in the same way as EAR, and that the decays for different events are mutually independent, the variation of EAR can be carried out through analyzing the variation of soil moisture content; the EAR for debris flow forecast can then be determined. The decaying of soil moisture content has been analyzed according to the field observation of rainfall and soil moisture content in Jiangjia Gully in the province of Yunan, where debris flows are caused by soil mechanical changing triggered by rainfall. Based on the observation and analysis, the formula of calculating EAR for Jiangjia Gully is made out with least-squares procedure.
分类号P642.23
资助信息中国科学院知识创新工程资助项目(KZCX3-SW-352),国家杰出青年科学基金项目(40025103)和中国科学院成都山地所创新前沿项目(C3200307)
语种中文
公开日期2010-07-08
内容类型期刊论文
源URL[http://ir.imde.ac.cn/handle/131551/472]  
专题成都山地灾害与环境研究所_成都山地所知识仓储(2009年以前)
成都山地灾害与环境研究所_山地灾害与地表过程重点实验室
推荐引用方式
GB/T 7714
韦方强,胡凯衡. 泥石流预报中前期有效降水量的确定[J]. 山地学报,2005,23(4):453-457.
APA 韦方强,&胡凯衡.(2005).泥石流预报中前期有效降水量的确定.山地学报,23(4),453-457.
MLA 韦方强,et al."泥石流预报中前期有效降水量的确定".山地学报 23.4(2005):453-457.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace