CORC  > 兰州理工大学  > 兰州理工大学  > 土木工程学院
Calculation and analysis of longitudinal settlement joint of shield tunnel based on dual elastic foundation beam
Li, Zhong; Chen, Si Yang
2012
会议日期June 24, 2012 - June 28, 2012
会议地点Puerto Vallarta, Mexico
关键词Complex condition Design and construction Elastic foundation beam Longitudinal settlement Settlement joints Shield tunnel Tunnel settlements Yangtze River
英文摘要Based on the model of dual elastic foundation beam, considered the effect of uneven settlement of soft layer, and treated the interaction between structure and soil as a plane problem, a plane numerical model is established. Then, the arrangement of settlement joint and the force and deformation of tunnel longitudinal structure are calculated and analyzed. By calculating that, the model can make full consideration of all factors which affect the uneven settlement of the tunnel, especially for the calculations of the settlement of tunnel in complex conditions. The obtained conclusions give reasonable data about the arrangement of settlement joint of the Yangtze River tunnel, and throw lights on the design and construction of tunnel segments in the future. © 2012 TSI Press.
会议录World Automation Congress Proceedings
会议录出版者IEEE Computer Society
语种英语
ISSN号21544824
内容类型会议论文
源URL[http://ir.lut.edu.cn/handle/2XXMBERH/115963]  
专题土木工程学院
作者单位School of Civil Engineering, LanZhou University of Technology, 730050, China
推荐引用方式
GB/T 7714
Li, Zhong,Chen, Si Yang. Calculation and analysis of longitudinal settlement joint of shield tunnel based on dual elastic foundation beam[C]. 见:. Puerto Vallarta, Mexico. June 24, 2012 - June 28, 2012.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace