Concrete crack control in monolithic concrete bed construction of high-speed railway in northwest area of China | |
Tang, Xianxi2; Zhu, Yanpeng2; Tang, Xianzhou1; Guo, Wei3 | |
2013 | |
关键词 | concrete crack control northwest area monolithic concrete bed of high-speed railway |
卷号 | 405-408 |
DOI | 10.4028/www.scientific.net/AMM.405-408.3081 |
页码 | 3081-+ |
英文摘要 | There were some reasons which cause the concrete cracks in monolithic concrete bed construction of high-speed railway. In this paper, combined with the specific situation of monolithic concrete bed construction of high-speed railway in northwest area of China, the states and causes of two kinds of cracks in monolithic concrete bed of high-speed railway were analyzed, the concrete cracking control measures were discussed from the concrete mixture ratio, construction technology and maintenance measures and other aspects, and the corresponding views were put forward. The study results had the important guiding significance on crack controls of concrete structure during the construction process of northwest area. |
会议录 | PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4 |
会议录出版者 | TRANS TECH PUBLICATIONS LTD |
会议录出版地 | KREUZSTRASSE 10, 8635 DURNTEN-ZURICH, SWITZERLAND |
语种 | 英语 |
WOS研究方向 | Engineering ; Materials Science |
WOS记录号 | WOS:000339463301254 |
内容类型 | 会议论文 |
源URL | [http://119.78.100.223/handle/2XXMBERH/37024] |
专题 | 土木工程学院 |
通讯作者 | Tang, Xianxi |
作者单位 | 1.Jinan Railway Adm, Jixi Track Maintenance Div, Jinan 250001, Peoples R China 2.Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China 3.Shandong Elect Power Engn Consulting Inst Co Ltd, Shanghai 250013, Peoples R China |
推荐引用方式 GB/T 7714 | Tang, Xianxi,Zhu, Yanpeng,Tang, Xianzhou,et al. Concrete crack control in monolithic concrete bed construction of high-speed railway in northwest area of China[C]. 见:. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论