CORC  > 兰州理工大学  > 兰州理工大学  > 土木工程学院
Application of a Total Station with RDM to Monitor Tunnel Displacement
Luo, Yanbin2; Chen, Jianxun2; Xi, Weizheng1; Zhao, Pengyu2; Li, Juzhu2; Qiao, Xiong3; Liu, Qin2
刊名JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES
2017-08
卷号31期号:4
关键词Tunnel displacement measurement Total station Remote distance measurement (RDM) Three-dimensional (3D) coordinate measurement Comparison tests
ISSN号0887-3828
DOI10.1061/(ASCE)CF.1943-5509.0001027
英文摘要Formulas for tunnel crown settlement and horizontal displacement measurement are presented in this paper according to the theory of tunnel displacement as measured by a total station with three-dimensional (3D) coordinate measurement and with remote distance measurement (RDM). Comparison tests using 3D coordinate measurement, RDM, and traditional measurement (i.e.,precision levels and tape extensometers) were conducted at a tunnel construction site. Tests showed that measurement of displacement by a total station is more convenient than that by traditional methods. Measurement of crown settlement by a total station with 3D coordinate measurement produces an error, which accounts for a 13% difference in total crown settlement. The accuracy of horizontal displacement measurement by a total station with 3D coordinate measurement is weak compared with RDM and traditional methods. Three-dimensional coordinate measurement is therefore not suitable for tunnel horizontal displacement. Tunnel displacement measurement by a total station with RDM obeys the law of curve and so meets the demand of construction monitoring attained by traditional methods. Use of a total station with RDM is the best method for measuring tunnel displacement, especially in tunnels with weak surrounding rock.
资助项目Science and Technology Coordinating Innovative Engineering Project of Shanxi Province[2014KTCG01-02]
WOS研究方向Construction & Building Technology ; Engineering
语种英语
出版者ASCE-AMER SOC CIVIL ENGINEERS
WOS记录号WOS:000400523100025
状态已发表
内容类型期刊论文
源URL[http://119.78.100.223/handle/2XXMBERH/33172]  
专题土木工程学院
通讯作者Chen, Jianxun
作者单位1.CCCC First Highway Consultants Ltd, Xian 710075, Peoples R China
2.Changan Univ, Sch Highway, Xian 710064, Peoples R China
3.LanZhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
推荐引用方式
GB/T 7714
Luo, Yanbin,Chen, Jianxun,Xi, Weizheng,et al. Application of a Total Station with RDM to Monitor Tunnel Displacement[J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES,2017,31(4).
APA Luo, Yanbin.,Chen, Jianxun.,Xi, Weizheng.,Zhao, Pengyu.,Li, Juzhu.,...&Liu, Qin.(2017).Application of a Total Station with RDM to Monitor Tunnel Displacement.JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES,31(4).
MLA Luo, Yanbin,et al."Application of a Total Station with RDM to Monitor Tunnel Displacement".JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES 31.4(2017).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace