Application of a Total Station with RDM to Monitor Tunnel Displacement | |
Luo, Yanbin2; Chen, Jianxun2; Xi, Weizheng1; Zhao, Pengyu2; Li, Juzhu2; Qiao, Xiong3; Liu, Qin2 | |
刊名 | JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES
![]() |
2017-08 | |
卷号 | 31期号:4 |
关键词 | Tunnel displacement measurement Total station Remote distance measurement (RDM) Three-dimensional (3D) coordinate measurement Comparison tests |
ISSN号 | 0887-3828 |
DOI | 10.1061/(ASCE)CF.1943-5509.0001027 |
英文摘要 | Formulas for tunnel crown settlement and horizontal displacement measurement are presented in this paper according to the theory of tunnel displacement as measured by a total station with three-dimensional (3D) coordinate measurement and with remote distance measurement (RDM). Comparison tests using 3D coordinate measurement, RDM, and traditional measurement (i.e.,precision levels and tape extensometers) were conducted at a tunnel construction site. Tests showed that measurement of displacement by a total station is more convenient than that by traditional methods. Measurement of crown settlement by a total station with 3D coordinate measurement produces an error, which accounts for a 13% difference in total crown settlement. The accuracy of horizontal displacement measurement by a total station with 3D coordinate measurement is weak compared with RDM and traditional methods. Three-dimensional coordinate measurement is therefore not suitable for tunnel horizontal displacement. Tunnel displacement measurement by a total station with RDM obeys the law of curve and so meets the demand of construction monitoring attained by traditional methods. Use of a total station with RDM is the best method for measuring tunnel displacement, especially in tunnels with weak surrounding rock. |
资助项目 | Science and Technology Coordinating Innovative Engineering Project of Shanxi Province[2014KTCG01-02] |
WOS研究方向 | Construction & Building Technology ; Engineering |
语种 | 英语 |
出版者 | ASCE-AMER SOC CIVIL ENGINEERS |
WOS记录号 | WOS:000400523100025 |
状态 | 已发表 |
内容类型 | 期刊论文 |
源URL | [http://119.78.100.223/handle/2XXMBERH/33172] ![]() |
专题 | 土木工程学院 |
通讯作者 | Chen, Jianxun |
作者单位 | 1.CCCC First Highway Consultants Ltd, Xian 710075, Peoples R China 2.Changan Univ, Sch Highway, Xian 710064, Peoples R China 3.LanZhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China |
推荐引用方式 GB/T 7714 | Luo, Yanbin,Chen, Jianxun,Xi, Weizheng,et al. Application of a Total Station with RDM to Monitor Tunnel Displacement[J]. JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES,2017,31(4). |
APA | Luo, Yanbin.,Chen, Jianxun.,Xi, Weizheng.,Zhao, Pengyu.,Li, Juzhu.,...&Liu, Qin.(2017).Application of a Total Station with RDM to Monitor Tunnel Displacement.JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES,31(4). |
MLA | Luo, Yanbin,et al."Application of a Total Station with RDM to Monitor Tunnel Displacement".JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES 31.4(2017). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论