CORC  > 兰州理工大学  > 兰州理工大学  > 能源与动力工程学院
Optimal quasi-periodic preventive maintenance policies for a repairable system with stochastic maintenance interval
Gao, Wenke6; Gao, Wenke5; Zhang, Zhisheng4; Ji, Hong3; Zhou, Yifan1; Liu, Qi2
刊名Eksploatacja i Niezawodnosc
2015-06-20
卷号17期号:3页码:389-397
关键词Engines Planning Stochastic systems
ISSN号15072711
DOI10.17531/ein.2015.3.9
英文摘要The usual preventive maintenance (PM) of a repairable system is done before failure at integer multiples of time T. In some real cases, PM cannot be performed as soon as a planned PM period is reached because of effects of some random factors, while it is usually done within an implemented period, and thus it makes the PM period become a stochastic interval. From this viewpoint, a quasi-periodic imperfect preventive maintenance policy is proposed in this paper, in which a repairable system experiences either a minor failure or catastrophic failure when a failure occurs, and the first (N-1) PM intervals is divided into a planned PM period and an implemented period. In the former, the system may be suffered an unplanned PM for removing a catastrophic failure and performing a PM, whereas in the latter, the system is preventively maintained following an occurrence of a catastrophic failure or a dynamic PM plan, whichever comes first. At the Nth PM interval, the system is replaced either when a catastrophic failure occurs or operational time reaches T, whichever comes first. An optimization of the proposed mode is introduced, the existence and the uniqueness of the optimal solution are presented, and a useful constraint of the implemented period is obtained. Finally, a real case study of PM on Chinese diesel locomotives is examined to illustrate the proposed maintenance policy. © 2015 Polish Academy of Sciences Branch Lublin. All rights reserved.
WOS研究方向Engineering
语种英语
出版者Polish Academy of Sciences Branch Lublin
WOS记录号WOS:000356605000009
内容类型期刊论文
源URL[http://ir.lut.edu.cn/handle/2XXMBERH/151284]  
专题能源与动力工程学院
科学技术处(军民融合领导小组办公室)
作者单位1.School of Mechanical Engineering, Southeast University, Nanjing; 211189, China;
2.School of Mechanical Science and Engineering, Jilin University, Changchun; 130025, China
3.School of Energy and Power Engineering, Lanzhou University of Technology, Lanzhou; 730050, China;
4.School of Mechanical Engineering, Southeast University, Nanjing; 211189, China;
5.School of Mechanical Engineering, Southeast University, Nanjing; 211189, China;
6.School of Energy and Power Engineering, Lanzhou University of Technology, Lanzhou; 730050, China;
推荐引用方式
GB/T 7714
Gao, Wenke,Gao, Wenke,Zhang, Zhisheng,et al. Optimal quasi-periodic preventive maintenance policies for a repairable system with stochastic maintenance interval[J]. Eksploatacja i Niezawodnosc,2015,17(3):389-397.
APA Gao, Wenke,Gao, Wenke,Zhang, Zhisheng,Ji, Hong,Zhou, Yifan,&Liu, Qi.(2015).Optimal quasi-periodic preventive maintenance policies for a repairable system with stochastic maintenance interval.Eksploatacja i Niezawodnosc,17(3),389-397.
MLA Gao, Wenke,et al."Optimal quasi-periodic preventive maintenance policies for a repairable system with stochastic maintenance interval".Eksploatacja i Niezawodnosc 17.3(2015):389-397.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace