The system of load optimal distributing of hydropower station based on multi-agent | |
Tinghong, Zhao2; Zibin, Man1; Guiquan, Bi2 | |
2008 | |
会议日期 | December 19, 2008 - December 20, 2008 |
会议地点 | Wuhan, China |
关键词 | Computation theory Hydroelectric power Hydroelectric power plants Intelligent computing Multi agent systems Calculation speed Hydropower stations Multi agent Optimal distributions Optimization algorithms Optimizing algorithm Power station Real time |
卷号 | 2 |
DOI | 10.1109/PACIIA.2008.372 |
页码 | 483-487 |
英文摘要 | In the course of whole operation of the power station, the distribution of the load among the units is a very key course, but the existing optimization algorithm has not reflected the real-time character of load optimal distributing, and because of having no considering repetitiveness of calculation, thus reduced the speed of calculation. This paper combines Multi-Agent theories and the unit's load optimal distribution of power station together, have set up a system of load optimal distribution of hydropower station based on Multi-Agent theories, this system fully utilizes intelligent of Agent and good communication harmony within Multi-Agent system, and store and use the result of load optimal distribution in the past, and combined real-time operating information with optimizing algorithms organically, thus strengthened the real-time character of load optimal distribution, and has improved the calculation speed greatly. © 2008 IEEE. |
会议录 | Proceedings - 2008 Pacific-Asia Workshop on Computational Intelligence and Industrial Application, PACIIA 2008
![]() |
会议录出版者 | IEEE Computer Society |
语种 | 英语 |
内容类型 | 会议论文 |
源URL | [http://ir.lut.edu.cn/handle/2XXMBERH/116867] ![]() |
专题 | 能源与动力工程学院 土木工程学院 图书馆 |
作者单位 | 1.Libratory, Lanzhou University of Technology, Gansu, Lanzhou, 730050, China 2.College of Fluid Power and Control Engineering, Lanzhou University of Technology, Gansu, Lanzhou, 730050, China; |
推荐引用方式 GB/T 7714 | Tinghong, Zhao,Zibin, Man,Guiquan, Bi. The system of load optimal distributing of hydropower station based on multi-agent[C]. 见:. Wuhan, China. December 19, 2008 - December 20, 2008. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论