Quasi-Periodic Replacement Policy for a Two-Unit Production System | |
Gao, Wenke1; Wang, Yu1; Yang, Tianshu1; Ji, Hong1; Chen, Yin2 | |
刊名 | Journal of Shanghai Jiaotong University (Science) |
2020-06-01 | |
卷号 | 25期号:3页码:398-406 |
关键词 | Genetic algorithms Maintenance optimization Maintenance policy Parallel production systems Production system Quasi-periodic Replacement period Replacement policy Running cost |
ISSN号 | 10071172 |
DOI | 10.1007/s12204-019-2149-4 |
英文摘要 | Maintenance optimization of periodic replacement for mono-unit production system is a widely discussed topic. In practice, the replacement for a parallel production system with multi-unit served by one repairman is universal. The replacement action is often implemented in a maintenance window at random, although the replacement period appears as a quasi-periodic event. To optimize these maintenance policies, this study analyzes a bivariate quasi-periodic replacement policy (T, W) for a two-unit parallel production system with a maintenance window and one repairman. One unit of the system is replaced when either a failure occurs or a replacement plan comes in the maintenance window, whichever comes first. If one of the two units is in the replacement, the other may continue operating or waiting until the replacement is completed. An optimal replacement window [T*, T* + W*] can be obtained by jointly considering the system’s long-running cost rate and the availability using the genetic algorithm. This study also introduces three examples of the production system with different types of units to illustrate the proposed policy. © 2019, Shanghai Jiao Tong University and Springer-Verlag GmbH Germany, part of Springer Nature. |
语种 | 英语 |
出版者 | Shanghai Jiaotong University |
内容类型 | 期刊论文 |
源URL | [http://ir.lut.edu.cn/handle/2XXMBERH/115479] |
专题 | 能源与动力工程学院 科学技术处(军民融合领导小组办公室) |
作者单位 | 1.College of Energy and Power Engineering, Lanzhou University of Technology, Lanzhou; 730050, China; 2.Technical Center, R&D Department, YEAL Electric Co., Ltd., Changchun; 130113, China |
推荐引用方式 GB/T 7714 | Gao, Wenke,Wang, Yu,Yang, Tianshu,et al. Quasi-Periodic Replacement Policy for a Two-Unit Production System[J]. Journal of Shanghai Jiaotong University (Science),2020,25(3):398-406. |
APA | Gao, Wenke,Wang, Yu,Yang, Tianshu,Ji, Hong,&Chen, Yin.(2020).Quasi-Periodic Replacement Policy for a Two-Unit Production System.Journal of Shanghai Jiaotong University (Science),25(3),398-406. |
MLA | Gao, Wenke,et al."Quasi-Periodic Replacement Policy for a Two-Unit Production System".Journal of Shanghai Jiaotong University (Science) 25.3(2020):398-406. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论