Integration of process planning and production scheduling with particle swarm optimization (PSO) algorithm and fuzzy inference systems - art. no. 60421W | |
Yang, YH; Zhao, FQ; Hong, Y; Yu, DM | |
2005 | |
关键词 | process planning production scheduling particle swarm optimization |
卷号 | 6042 |
DOI | 10.1117/12.664634 |
页码 | W421-W421 |
英文摘要 | Integration of process planning with scheduling by considering the manufacturing system's capacity, cost and capacity in its workshop is a critical issue. The concurrency between them can also eliminate the redundant process and optimize the entire production cycle, but most integrated process planning and scheduling methods only consider the time aspects of the alternative machines when constructing schedules. In this paper, a fuzzy inference system (FIS) in choosing alternative machines for integrated process planning and scheduling of a job shop manufacturing system is presented. Instead of choosing alternative machines randomly, machines are being selected based on the machines reliability. The mean time to failure (MTF) values is input in a fuzzy inference mechanism, which outputs the machine reliability. The machine is then being penalized based on the fuzzy output. The most reliable machine will have the higher priority to be chosen. In order to overcome the problem of un-utilization machines, sometimes faced by unreliable machine, the particle swarm optimization (PSO) have been used to balance the load for all the machines. Simulation study shows that the system can be used as an alternative way of choosing machines in integrated process planning and scheduling. |
会议录 | ICMIT 2005: Control Systems and Robotics, Pts 1 and 2 |
会议录出版者 | SPIE-INT SOC OPTICAL ENGINEERING |
会议录出版地 | 1000 20TH ST, PO BOX 10, BELLINGHAM, WA 98227-0010 USA |
语种 | 英语 |
WOS研究方向 | Automation & Control Systems ; Computer Science ; Robotics |
WOS记录号 | WOS:000235304400069 |
内容类型 | 会议论文 |
源URL | [http://119.78.100.223/handle/2XXMBERH/38312] |
专题 | 兰州理工大学 |
通讯作者 | Yang, YH |
作者单位 | Lanzhou Univ Technol, Coll Civil Engn, Lanzhou 730050, Gansu, Peoples R China |
推荐引用方式 GB/T 7714 | Yang, YH,Zhao, FQ,Hong, Y,et al. Integration of process planning and production scheduling with particle swarm optimization (PSO) algorithm and fuzzy inference systems - art. no. 60421W[C]. 见:. |