Influence of Benoto bored pile construction on nearby existing tunnel: A case study | |
Gao, Guoyao1,2; Zhuang, Yan1,3; Wang, Kangyu4; Chen, Liang5 | |
刊名 | SOILS AND FOUNDATIONS |
2019-04 | |
卷号 | 59期号:2页码:544-555 |
关键词 | Lateral displacement Benoto bored piles Existing tunnel Construction technology Case study |
ISSN号 | 0038-0806 |
DOI | 10.1016/j.sandf.2018.11.006 |
英文摘要 | The monitoring and analysis of lateral displacement for metro tunnels are very important because the metro systems are the lifeline of metropolises. This paper presents a case study of a site in Nanjing, China, where the Benoto bored piles were constructed nearby the existing tunnel. The construction technology, a combination of the Benoto bored piles construction and the conventional construction technology of circulating slurry, is illustrated in detail. The lateral displacement at six test sections were measured and discussed to assess the impact of piles installation on the stability and integrity of the existing tunnel. The measured results showed that during the construction period using the Benoto method, relatively large lateral displacement occurred at the depth with soft soil (Mucky silty clay), with characteristics including a large void ratio, high plasticity, poor permeability, high water content, low shear strength, and low modulus of deformation. During the construction period of the conventional Circulating-Slurry method, negative lateral displacement occurred below the tip of the casing due to the soil arching effect, indicating an inward movement towards the Benoto bored piles. The maximum lateral displacement decreased as the distance between piles and inclinometers increased, with a maximum difference of 45% at the end of the measurements. It was also observed that the measured maximum lateral displacement was less than the cumulative trigger value of 20 mm, indicating an effectiveness of Benoto bored piles constructed adjacent to existing tunnel. This case study may provide the means for a qualitative assessment for engineering constructions where the situation bears similarities. (C) 2019 Production and hosting by Elsevier B.V. on behalf of The Japanese Geotechnical Society. |
资助项目 | Natural Science Foundation of Jiangsu Province[BK20151495] |
WOS研究方向 | Engineering ; Geology |
语种 | 英语 |
出版者 | JAPANESE GEOTECHNICAL SOC |
WOS记录号 | WOS:000471727100023 |
状态 | 已发表 |
内容类型 | 期刊论文 |
源URL | [http://119.78.100.223/handle/2XXMBERH/32021] |
专题 | 兰州理工大学 |
通讯作者 | Wang, Kangyu |
作者单位 | 1.Southeast Univ, Sch Civil Engn, Key Lab RC & PRC Struct, Educ Minist, 2 Sipailou, Nanjing 210096, Jiangsu, Peoples R China 2.Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Gansu, Peoples R China 3.Changsha Univ Sci & Technol, Natl Engn Lab Highway Maintenance Technol, Changsha 410114, Hunan, Peoples R China 4.Zhejiang Univ Technol, Sch Civil Engn & Architecture, Hangzhou 310014, Zhejiang, Peoples R China 5.Hohai Univ, Geotech Res Inst, Key Lab, Minist Educ Geomech & Embankment Engn, 1 Xikang Rd, Nanjing 210098, Jiangsu, Peoples R China |
推荐引用方式 GB/T 7714 | Gao, Guoyao,Zhuang, Yan,Wang, Kangyu,et al. Influence of Benoto bored pile construction on nearby existing tunnel: A case study[J]. SOILS AND FOUNDATIONS,2019,59(2):544-555. |
APA | Gao, Guoyao,Zhuang, Yan,Wang, Kangyu,&Chen, Liang.(2019).Influence of Benoto bored pile construction on nearby existing tunnel: A case study.SOILS AND FOUNDATIONS,59(2),544-555. |
MLA | Gao, Guoyao,et al."Influence of Benoto bored pile construction on nearby existing tunnel: A case study".SOILS AND FOUNDATIONS 59.2(2019):544-555. |