Lean Improvement of Product P Assembly Line based on Value Stream Map | |
Chang K(常凯)2,3; Tan GC(谭广超)2,3; Wang XL(王晓龙)2,3; Zhou CJ(周长军)1; Wei LY(魏璐媛)1 | |
2020 | |
会议日期 | February 27-29, 2020 |
会议地点 | Shenzhen, China |
页码 | 1-8 |
英文摘要 | Based on the product P assembly line transformation project of a company, the main problems of the original production line are analyzed with the method of Value Stream Map. Lean improvement measures which is used in the design of new production line are put forward in the aspects of overall layout, process arrangement, production mode, material buffer, auxiliary equipment and personnel allocation to reduce some non-value added activities and wasteful behaviors. By the Value Stream Map of the improved lean production line, the evaluation indexes can be improved significantly. After the new production line is completed and put into production, the workshop stock is reduced, the production efficiency is improved, and the production cost is reduced. |
产权排序 | 1 |
会议录 | 2020 5th International Conference on Mechanical, Manufacturing, Modeling and Mechatronics (IC4M 2020) & 2020 5th International Conference on Design Engineering and Science (ICDES 2020) |
会议录出版者 | IOP |
会议录出版地 | Bristol, UK |
语种 | 英语 |
ISSN号 | 1757-899X |
内容类型 | 会议论文 |
源URL | [http://ir.sia.cn/handle/173321/27956] |
专题 | 沈阳自动化研究所_智能检测与装备研究室 |
通讯作者 | Chang K(常凯) |
作者单位 | 1.Xi'an Aerospace Engine Co., Ltd. 2.Shenyang Institute of Automation Chinese Academy of Sciences, Shenyang 110016, China 3.Institutes for Robotics and Intelligent Manufacturing, Chinese Academy of Sciences, Shenyang 110169, China |
推荐引用方式 GB/T 7714 | Chang K,Tan GC,Wang XL,et al. Lean Improvement of Product P Assembly Line based on Value Stream Map[C]. 见:. Shenzhen, China. February 27-29, 2020. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论