Lean Improvement of Product P Assembly Line based on Value Stream Map
Chang K(常凯)2,3; Tan GC(谭广超)2,3; Wang XL(王晓龙)2,3; Zhou CJ(周长军)1; Wei LY(魏璐媛)1
2020
会议日期February 27-29, 2020
会议地点Shenzhen, China
页码1-8
英文摘要Based on the product P assembly line transformation project of a company, the main problems of the original production line are analyzed with the method of Value Stream Map. Lean improvement measures which is used in the design of new production line are put forward in the aspects of overall layout, process arrangement, production mode, material buffer, auxiliary equipment and personnel allocation to reduce some non-value added activities and wasteful behaviors. By the Value Stream Map of the improved lean production line, the evaluation indexes can be improved significantly. After the new production line is completed and put into production, the workshop stock is reduced, the production efficiency is improved, and the production cost is reduced.
产权排序1
会议录2020 5th International Conference on Mechanical, Manufacturing, Modeling and Mechatronics (IC4M 2020) & 2020 5th International Conference on Design Engineering and Science (ICDES 2020)
会议录出版者IOP
会议录出版地Bristol, UK
语种英语
ISSN号1757-899X
内容类型会议论文
源URL[http://ir.sia.cn/handle/173321/27956]  
专题沈阳自动化研究所_智能检测与装备研究室
通讯作者Chang K(常凯)
作者单位1.Xi'an Aerospace Engine Co., Ltd.
2.Shenyang Institute of Automation Chinese Academy of Sciences, Shenyang 110016, China
3.Institutes for Robotics and Intelligent Manufacturing, Chinese Academy of Sciences, Shenyang 110169, China
推荐引用方式
GB/T 7714
Chang K,Tan GC,Wang XL,et al. Lean Improvement of Product P Assembly Line based on Value Stream Map[C]. 见:. Shenzhen, China. February 27-29, 2020.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace