Integrated operation for the planning of CO2 capture path in CCS-EOR project
Guo, Jian-Xin; Huang, Chen; Wang, Jian-Liang; Meng, Xiao-Yan
刊名JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING
2020
卷号186
DOI10.1016/j.petrol.2019.106720
英文摘要Carbon utilization and storage (CCUS) project represented by enhanced oil recovery (EOR) technology provides a feasible way for the CCS dynamic cost to decline. With the development of CCS and the cost reduction of power plant capture, the possibility of oil companies receiving CO2 from power plants will increase, which makes CO2 and oil resources more fully utilized. Based on this fact, this work proposes a novel model regarding the CCS-EOR project to systematically evaluate the CCS development path and the EOR utilization process. By considering the CO2 source captured by CCS and the utilization process of EOR process, the cost-benefit model of integrated system is established, and the CO2 capture/injection path of CCS/EOR is optimized. This model helps to analyze CCS investment and carbon capture process from the perspective of the whole project process, and provides a feasible reference for practical large-scale engineering decision-making project.
语种英语
内容类型期刊论文
源URL[http://ir.casisd.cn/handle/190111/9810]  
专题中国科学院科技战略咨询研究院
推荐引用方式
GB/T 7714
Guo, Jian-Xin,Huang, Chen,Wang, Jian-Liang,et al. Integrated operation for the planning of CO2 capture path in CCS-EOR project[J]. JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING,2020,186.
APA Guo, Jian-Xin,Huang, Chen,Wang, Jian-Liang,&Meng, Xiao-Yan.(2020).Integrated operation for the planning of CO2 capture path in CCS-EOR project.JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING,186.
MLA Guo, Jian-Xin,et al."Integrated operation for the planning of CO2 capture path in CCS-EOR project".JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING 186(2020).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace