Optimization and Scheduling of Byproduct Gas System in Steel Plant | |
Yang Jinghui; Cai Jiuju; Sun Wenqiang; Liu Jingyu | |
刊名 | JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL |
2015 | |
卷号 | 22期号:5页码:408-413 |
关键词 | MILP MODEL IRON-MAKING ENERGY PREDICTION INDUSTRY iron and steel industry byproduct gas energy saving optimization scheduling |
ISSN号 | 1006-706X |
其他题名 | Optimization and Scheduling of Byproduct Gas System in Steel Plant |
英文摘要 | A mathematical model was proposed to optimize byproduct gas system and reduce the total cost. The scope and boundaries of the system were also discussed at the same time. Boilers and gasholders were buffer users to solve the fluctuation of byproduct gases. The priority of gasholders should be ranked the last. The allocation of surplus gases among gasholders and boilers was also discussed to make full use of gases and realize zero emission targets. Case study shows that the proposed model made good use of byproduct gases and at least 7. 8% operation cost was reduced, compared with real data in iron and steel industry. |
资助项目 | [Fundamental Research Funds for the Central Universities of China] |
语种 | 英语 |
CSCD记录号 | CSCD:5427974 |
内容类型 | 期刊论文 |
源URL | [http://ir.imr.ac.cn/handle/321006/142961] |
专题 | 金属研究所_中国科学院金属研究所 |
作者单位 | 中国科学院金属研究所 |
推荐引用方式 GB/T 7714 | Yang Jinghui,Cai Jiuju,Sun Wenqiang,et al. Optimization and Scheduling of Byproduct Gas System in Steel Plant[J]. JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL,2015,22(5):408-413. |
APA | Yang Jinghui,Cai Jiuju,Sun Wenqiang,&Liu Jingyu.(2015).Optimization and Scheduling of Byproduct Gas System in Steel Plant.JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL,22(5),408-413. |
MLA | Yang Jinghui,et al."Optimization and Scheduling of Byproduct Gas System in Steel Plant".JOURNAL OF IRON AND STEEL RESEARCH INTERNATIONAL 22.5(2015):408-413. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论