CORC  > 湖南大学
A stochastic scheduling algorithm for precedence constrained tasks on Grid
Tang, Xiaoyong; Li, Kenli; Liao, Guiping; Fang, Kui; Wu, Fan
刊名Future Generation Computer Systems
2011
卷号Vol.27 No.8页码:1083-1091
关键词Stochastic scheduling Grid Precedence constrained tasks Makespan
ISSN号0167-739X
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/6514766
专题湖南大学
作者单位1.Information Science and Technology College, Hunan Agricultural University, Changsha, China
2.School of Information Science and Engineering, Hunan University, Changsha, China
推荐引用方式
GB/T 7714
Tang, Xiaoyong,Li, Kenli,Liao, Guiping,et al. A stochastic scheduling algorithm for precedence constrained tasks on Grid[J]. Future Generation Computer Systems,2011,Vol.27 No.8:1083-1091.
APA Tang, Xiaoyong,Li, Kenli,Liao, Guiping,Fang, Kui,&Wu, Fan.(2011).A stochastic scheduling algorithm for precedence constrained tasks on Grid.Future Generation Computer Systems,Vol.27 No.8,1083-1091.
MLA Tang, Xiaoyong,et al."A stochastic scheduling algorithm for precedence constrained tasks on Grid".Future Generation Computer Systems Vol.27 No.8(2011):1083-1091.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace