CORC  > 中国石油大学(北京)
A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling
Chen, Xuyue; Gao, Deli; Guo, Boyun; Luo, Limin; Liu, Xiaobo; Zhang, Xin
刊名JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING
2014
卷号21页码:1084-1090
关键词Gas drilling Horizontal well Hole cleaning Cuttings carry Terminal velocity Gas injection rate
ISSN号1875-5100
DOI10.1016/j.jngse.2014.11.009
URL标识查看原文
收录类别SCIE
WOS记录号WOS:000347743200113
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/6301732
专题中国石油大学(北京)
推荐引用方式
GB/T 7714
Chen, Xuyue,Gao, Deli,Guo, Boyun,et al. A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling[J]. JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING,2014,21:1084-1090.
APA Chen, Xuyue,Gao, Deli,Guo, Boyun,Luo, Limin,Liu, Xiaobo,&Zhang, Xin.(2014).A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling.JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING,21,1084-1090.
MLA Chen, Xuyue,et al."A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling".JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING 21(2014):1084-1090.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace