A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling | |
Chen, Xuyue; Gao, Deli; Guo, Boyun; Luo, Limin; Liu, Xiaobo; Zhang, Xin | |
刊名 | JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING |
2014 | |
卷号 | 21页码:1084-1090 |
关键词 | Gas drilling Horizontal well Hole cleaning Cuttings carry Terminal velocity Gas injection rate |
ISSN号 | 1875-5100 |
DOI | 10.1016/j.jngse.2014.11.009 |
URL标识 | 查看原文 |
收录类别 | SCIE |
WOS记录号 | WOS:000347743200113 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/6301732 |
专题 | 中国石油大学(北京) |
推荐引用方式 GB/T 7714 | Chen, Xuyue,Gao, Deli,Guo, Boyun,et al. A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling[J]. JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING,2014,21:1084-1090. |
APA | Chen, Xuyue,Gao, Deli,Guo, Boyun,Luo, Limin,Liu, Xiaobo,&Zhang, Xin.(2014).A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling.JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING,21,1084-1090. |
MLA | Chen, Xuyue,et al."A new method for determining the minimum gas injection rate required for hole cleaning in horizontal gas drilling".JOURNAL OF NATURAL GAS SCIENCE AND ENGINEERING 21(2014):1084-1090. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论