CORC  > 山东大学
A heuristic algorithm for task scheduling based on mean load on grid
Ni, Li-Na; Zhang, Jin-Quan; Yan, Chun-Gang; Jiang, Chang-Jun
刊名JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY
2006
卷号21期号:4页码:559-564
关键词heuristic algorithm task scheduling load balancing knowledge grid
DOI10.1007/s11390-006-0559-x
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/6265220
专题山东大学
作者单位1.Tongji Univ, Dept Comp Sci, Shanghai 200092, Peoples R China.
2.[Ni, LN
3.Zhang, JQ
4.Yan, CG
5.Jiang, C
推荐引用方式
GB/T 7714
Ni, Li-Na,Zhang, Jin-Quan,Yan, Chun-Gang,et al. A heuristic algorithm for task scheduling based on mean load on grid[J]. JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY,2006,21(4):559-564.
APA Ni, Li-Na,Zhang, Jin-Quan,Yan, Chun-Gang,&Jiang, Chang-Jun.(2006).A heuristic algorithm for task scheduling based on mean load on grid.JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY,21(4),559-564.
MLA Ni, Li-Na,et al."A heuristic algorithm for task scheduling based on mean load on grid".JOURNAL OF COMPUTER SCIENCE AND TECHNOLOGY 21.4(2006):559-564.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace