Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining | |
Han, CL; Zhang, N; Li, BY; Si, GY; Zheng, XG | |
刊名 | Journal of Central South University
![]() |
2015 | |
卷号 | Vol.22 No.11页码:4445-4455 |
关键词 | hard roof pressure relief cantilever length double stress peaks gob-side entry retaining |
ISSN号 | 2095-2899;2227-5223 |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/6092400 |
专题 | 湖南大学 |
作者单位 | 1.School of Mines, Key Laboratory of Deep Coal Resource Mining of Ministry of Education,China University of Mining and Technology,Xuzhou,China 2.Hunan Key Laboratory of Safe Mining Techniques of Coal Mines,Hunan University of Science and Technology,Xiangtan,China 3.Earth Science and Engineering,Imperial College London,London,England |
推荐引用方式 GB/T 7714 | Han, CL,Zhang, N,Li, BY,et al. Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining[J]. Journal of Central South University,2015,Vol.22 No.11:4445-4455. |
APA | Han, CL,Zhang, N,Li, BY,Si, GY,&Zheng, XG.(2015).Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining.Journal of Central South University,Vol.22 No.11,4445-4455. |
MLA | Han, CL,et al."Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining".Journal of Central South University Vol.22 No.11(2015):4445-4455. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论