CORC  > 山东大学
Robustness analysis of the satisfied solution of some job-shop schedule problems
Ding, Ran; Li, Qiqiang; Sun, Tongjing
2004
会议名称WCICA 2004 - Fifth World Congress on Intelligent Control and Automation, Conference Proceedings
会议日期15 June 2004 through 19 June 2004
关键词Critical path Disjunctive graph Genetic algorithm Job-shop schedule Robustness
卷号4
DOI10.1109/WCICA.2004.1343062
页码2972-2975
收录类别EI ; SCOPUS
会议录Proceedings of the World Congress on Intelligent Control and Automation (WCICA)
URL标识查看原文
内容类型会议论文
URI标识http://www.corc.org.cn/handle/1471x/6086016
专题山东大学
作者单位Sch. of Contr. Sci. and Engineering, Shandong University, Jinan, 250061
推荐引用方式
GB/T 7714
Ding, Ran,Li, Qiqiang,Sun, Tongjing. Robustness analysis of the satisfied solution of some job-shop schedule problems[C]. 见:WCICA 2004 - Fifth World Congress on Intelligent Control and Automation, Conference Proceedings. 15 June 2004 through 19 June 2004.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace