Optimal reserved water of pumped storage power station for black-start | |
Wang, Chunyi; Liu, Yutian; He, Baoling; Qiu, Xizhao; Mu, Hong; Zhou, Wenjun; Xu, Gang | |
2007 | |
会议名称 | 8th International Power Engineering Conference, IPEC 2007 |
会议日期 | 3 December 2007 through 6 December 2007 |
关键词 | Black-start Optimal reserved water Pumped storage power station |
页码 | 945-949 |
收录类别 | EI ; SCOPUS |
会议录 | 8th International Power Engineering Conference, IPEC 2007
![]() |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/6077947 |
专题 | 山东大学 |
作者单位 | 1.IEEE 2.Shandong Electric Power Control Center, Jinan 250001, China 3.[Wang, Chunyi 4.Liu, Yutian 5.He, |
推荐引用方式 GB/T 7714 | Wang, Chunyi,Liu, Yutian,He, Baoling,et al. Optimal reserved water of pumped storage power station for black-start[C]. 见:8th International Power Engineering Conference, IPEC 2007. 3 December 2007 through 6 December 2007. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论