Failure mechanism and stability control of roof roadway in fractured zone | |
Zhou Ze; Zhu Chuanqu; Li Qingfeng | |
刊名 | Journal of China Coal Society |
2017 | |
卷号 | Vol.42 No.6页码:1400-1407 |
关键词 | ascending mining roof roadway plastic zone fissure of surrounding rock |
ISSN号 | 0253-9993 |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/6045068 |
专题 | 湖南大学 |
推荐引用方式 GB/T 7714 | Zhou Ze,Zhu Chuanqu,Li Qingfeng. Failure mechanism and stability control of roof roadway in fractured zone[J]. Journal of China Coal Society,2017,Vol.42 No.6:1400-1407. |
APA | Zhou Ze,Zhu Chuanqu,&Li Qingfeng.(2017).Failure mechanism and stability control of roof roadway in fractured zone.Journal of China Coal Society,Vol.42 No.6,1400-1407. |
MLA | Zhou Ze,et al."Failure mechanism and stability control of roof roadway in fractured zone".Journal of China Coal Society Vol.42 No.6(2017):1400-1407. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论