Hybrid Genetic Simulated Annealing Algorithm for Improved Flow Shop Scheduling with Makespan Criterion | |
Wei, Hongjing; Li, Shaobo; Jiang, Houmin; Hu, Jie; Hu, Jianjun | |
2018 | |
卷号 | 8期号:12 |
URL标识 | 查看原文 |
WOS记录号 | WOS:000455145000289 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5837889 |
专题 | 贵州理工学院 |
作者单位 | 1.[1]Guizhou Univ, Minist Educ, Key Lab Adv Mfg Technol, Guiyang 550025, Guizhou, Peoples R China 2.[2]Guizhou Inst Technol, Sch Mech Engn, Guiyang 550003, Guizhou, Peoples R China 3.[3]Guizhou Univ, Sch Mech Engn, Guiyang 550025, Guizhou, Peoples R China 4.[4]Guizhou Univ, Guizhou Prov Key Lab Publ Big Data, Guiyang 550025, Guizhou, Peoples R China 5.[5]Guizhou Univ, Coll Comp Sci & Technol, Guiyang 550025, Guizhou, Peoples R China 6.[6]GuiZhou Univ Finance & Econ, Coll Big Data Stat, Guiyang 550025, Guizhou, Peoples R China 7.[7]Univ South Carolina, Dept Comp Sci & Engn, Columbia, SC 29208 USA |
推荐引用方式 GB/T 7714 | Wei, Hongjing,Li, Shaobo,Jiang, Houmin,et al. Hybrid Genetic Simulated Annealing Algorithm for Improved Flow Shop Scheduling with Makespan Criterion[J],2018,8(12). |
APA | Wei, Hongjing,Li, Shaobo,Jiang, Houmin,Hu, Jie,&Hu, Jianjun.(2018).Hybrid Genetic Simulated Annealing Algorithm for Improved Flow Shop Scheduling with Makespan Criterion.,8(12). |
MLA | Wei, Hongjing,et al."Hybrid Genetic Simulated Annealing Algorithm for Improved Flow Shop Scheduling with Makespan Criterion".8.12(2018). |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论