CORC  > 山东师范大学
The design and implementation of risk assessment model for hazard installations based on AHP-FCE method: A case study of Nansi Lake BasinSCI被引量:SCI原文链接
Wang, Weiliang[1]; Dong, Chunling[1]; Dong, Wenping[2]; Yang, Chuanxi[1]; Ju, Tiantian[1]; Huang, Lihui[3]; Ren, Zongming[1]
2016
卷号36页码:162-171
URL标识查看原文
WOS记录号WOS:000390970000018
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5783373
专题山东师范大学
作者单位1.[1]Shandong Normal Univ, Coll Geog & Environm, Wenhuadong Rd 88, Jinan 250014, Peoples R China
2.[2]Shandong Acad Environm Sci & Environm Engn Co Ltd, Jinan 250013, Peoples R China
3.[3]Shandong Univ, Sch Environm Sci & Engn, Shandong Prov Key Lab Water Pollut Control & Reso, Jinan 250100, Peoples R China
推荐引用方式
GB/T 7714
Wang, Weiliang[1],Dong, Chunling[1],Dong, Wenping[2],等. The design and implementation of risk assessment model for hazard installations based on AHP-FCE method: A case study of Nansi Lake BasinSCI被引量:SCI原文链接[J],2016,36:162-171.
APA Wang, Weiliang[1].,Dong, Chunling[1].,Dong, Wenping[2].,Yang, Chuanxi[1].,Ju, Tiantian[1].,...&Ren, Zongming[1].(2016).The design and implementation of risk assessment model for hazard installations based on AHP-FCE method: A case study of Nansi Lake BasinSCI被引量:SCI原文链接.,36,162-171.
MLA Wang, Weiliang[1],et al."The design and implementation of risk assessment model for hazard installations based on AHP-FCE method: A case study of Nansi Lake BasinSCI被引量:SCI原文链接".36(2016):162-171.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace