CORC  > 山东大学
Unit commitment considering expected customer interruption cost
Liu, Ningning; Zhang, Li; Han, Xueshan
刊名2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010
2010
页码120-125
关键词Expected customer interruption cost (ECOST) Expected energy not supplied (EENS) Mixed-integer linear programming (MILP) Spinning reserve (SR) Unit commitment (UC)
DOI10.1109/PMAPS.2010.5528985
会议名称2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010
URL标识查看原文
会议日期14 June 2010 through 17 June 2010
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5514319
专题山东大学
作者单位School of Electrical Engineering, Shandong University, Jinan, China
推荐引用方式
GB/T 7714
Liu, Ningning,Zhang, Li,Han, Xueshan. Unit commitment considering expected customer interruption cost[J]. 2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010,2010:120-125.
APA Liu, Ningning,Zhang, Li,&Han, Xueshan.(2010).Unit commitment considering expected customer interruption cost.2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010,120-125.
MLA Liu, Ningning,et al."Unit commitment considering expected customer interruption cost".2010 IEEE 11th International Conference on Probabilistic Methods Applied to Power Systems, PMAPS 2010 (2010):120-125.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace