CORC  > 湖南大学
Traffic Allocation Mode of PPP Highway Project: A Risk Management Approach
Li, Jie; Mao, Peng; Dai, Zhaohua; Zhang, Jing
刊名ADVANCES IN CIVIL ENGINEERING
2018
ISSN号1687-8086
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5461153
专题湖南大学
作者单位Nanjing Forestry Univ, Sch Civil Engn, Nanjing 210037, Jiangsu, Peoples R China
推荐引用方式
GB/T 7714
Li, Jie,Mao, Peng,Dai, Zhaohua,et al. Traffic Allocation Mode of PPP Highway Project: A Risk Management Approach[J]. ADVANCES IN CIVIL ENGINEERING,2018.
APA Li, Jie,Mao, Peng,Dai, Zhaohua,&Zhang, Jing.(2018).Traffic Allocation Mode of PPP Highway Project: A Risk Management Approach.ADVANCES IN CIVIL ENGINEERING.
MLA Li, Jie,et al."Traffic Allocation Mode of PPP Highway Project: A Risk Management Approach".ADVANCES IN CIVIL ENGINEERING (2018).
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace