CORC  > 大连理工大学
A Decision Method of Concession Period for Traffic Projects in a Build-Operate-Transfer Scheme
Wang Dong-bo; Song Jin-bo; Dai Da-shuang; Li Zheng
2009
会议名称16th International Conference on Management Science and Engineering
会议日期2009-09-14
会议地点Moscow, RUSSIA
关键词build-operate-transfer (BOT) concession period Monte Carlo simulation traffic project
页码1935-1941
会议录16th International Conference on Management Science and Engineering
URL标识查看原文
内容类型会议论文
URI标识http://www.corc.org.cn/handle/1471x/5324036
专题大连理工大学
作者单位Dalian Univ Technol, Sch Management, Dalian 116024, Peoples R China.
推荐引用方式
GB/T 7714
Wang Dong-bo,Song Jin-bo,Dai Da-shuang,et al. A Decision Method of Concession Period for Traffic Projects in a Build-Operate-Transfer Scheme[C]. 见:16th International Conference on Management Science and Engineering. Moscow, RUSSIA. 2009-09-14.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace