A Decision Method of Concession Period for Traffic Projects in a Build-Operate-Transfer Scheme | |
Wang Dong-bo; Song Jin-bo; Dai Da-shuang; Li Zheng | |
2009 | |
会议名称 | 16th International Conference on Management Science and Engineering |
会议日期 | 2009-09-14 |
会议地点 | Moscow, RUSSIA |
关键词 | build-operate-transfer (BOT) concession period Monte Carlo simulation traffic project |
页码 | 1935-1941 |
会议录 | 16th International Conference on Management Science and Engineering
![]() |
URL标识 | 查看原文 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5324036 |
专题 | 大连理工大学 |
作者单位 | Dalian Univ Technol, Sch Management, Dalian 116024, Peoples R China. |
推荐引用方式 GB/T 7714 | Wang Dong-bo,Song Jin-bo,Dai Da-shuang,et al. A Decision Method of Concession Period for Traffic Projects in a Build-Operate-Transfer Scheme[C]. 见:16th International Conference on Management Science and Engineering. Moscow, RUSSIA. 2009-09-14. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论