The Risk Evaluation Model of Mining Project Investment Based on Fuzzy Comprehensive Method | |
Wang, Zuogong[1]; Zheng, Jie[2]; Li, Huiyang[3] | |
2013 | |
会议名称 | International Conference on Sustainable Energy and Environmental Engineering |
会议日期 | 2013-01-01 |
关键词 | Mining projects Risk assessment Fuzzy comprehensive evaluation AHP method |
页码 | 2884-2890 |
收录类别 | EI ; CPCI-S |
URL标识 | 查看原文 |
WOS记录号 | WOS:000320828201234 |
内容类型 | 会议论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/5242784 |
专题 | 河南大学 |
作者单位 | 1.[1]Henan Univ, Inst Econ, Kaifeng 475004, Henan Province, Peoples R China. 2.[2]Henan Univ, Inst Econ, Kaifeng 475004, Henan Province, Peoples R China. 3.[3]Henan Univ, Inst Econ, Kaifeng 475004, Henan Province, Peoples R China. |
推荐引用方式 GB/T 7714 | Wang, Zuogong[1],Zheng, Jie[2],Li, Huiyang[3]. The Risk Evaluation Model of Mining Project Investment Based on Fuzzy Comprehensive Method[C]. 见:International Conference on Sustainable Energy and Environmental Engineering. 2013-01-01. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论