Cost optimization problem of hybrid flow-shop based on PSO algorithm | |
Han ZH(韩忠华); Ma Xiaofu; Yao LL(姚丽丽); Shi HB(史海波)![]() | |
2012 | |
会议名称 | 2012 2nd International Conference on Materials Science and Information Technology, MSIT 2012 |
会议日期 | August 24, 2012 - August 26, 2012 |
会议地点 | Xi |
关键词 | Costs Global optimization Information technology Materials science Particle swarm optimization (PSO) Scheduling |
页码 | 1616-1620 |
通讯作者 | 韩忠华 |
中文摘要 | A PSO-algorithm-based job scheduling method that takes production cost as optimization object is presented in this paper. The cost optimization model of HFSP, in which production cost is considered as an optimal factor, is constructed. PSO is used to take global optimization, make the production task assignment and find which machine the jobs should be assigned at each stage, which is also called the process route of the job. After that the local assignment rules are used to determine the job's starting time and processing sequence at each stage. The total production cost converted by time-based scheduling results is comprehensively considering the processing cost, waiting costs, and the products storage costs. The numerical results show the effectiveness of the algorithm after comparing between multi-group programs. |
收录类别 | EI |
产权排序 | 1 |
会议录 | Advanced Materials Research
![]() |
会议录出版者 | Trans Tech Publications |
会议录出版地 | Clausthal-Zellerfeld, Germany |
语种 | 英语 |
ISBN号 | 978-3-03785-438-9 |
内容类型 | 会议论文 |
源URL | [http://ir.sia.cn/handle/173321/10128] ![]() |
专题 | 沈阳自动化研究所_自动化系统研究室 |
推荐引用方式 GB/T 7714 | Han ZH,Ma Xiaofu,Yao LL,et al. Cost optimization problem of hybrid flow-shop based on PSO algorithm[C]. 见:2012 2nd International Conference on Materials Science and Information Technology, MSIT 2012. Xi. August 24, 2012 - August 26, 2012. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论