CORC  > 山东大学
Total transfer capability of transmission line cross-section with considering power constraints
Liang L.-K.; Han X.-S.; Wang Y.-L.
刊名Shenyang Gongye Daxue Xuebao/Journal of Shenyang University of Technology
2013
卷号35期号:2页码:133-138
关键词Excitation system Interior-point method Large-scale wind farm Optimal power flow Power constraint Speed governor Total transfer capability (TTC) Transmission line cross-section Trust region
DOI10.7688/j.issn.1000-1646.2013.02.03
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/5145665
专题山东大学
作者单位School of Electric Engineering, Shandong University, Jinan 250061, China, School of Mechanical, Electrical and Information Engineering,
推荐引用方式
GB/T 7714
Liang L.-K.,Han X.-S.,Wang Y.-L.. Total transfer capability of transmission line cross-section with considering power constraints[J]. Shenyang Gongye Daxue Xuebao/Journal of Shenyang University of Technology,2013,35(2):133-138.
APA Liang L.-K.,Han X.-S.,&Wang Y.-L..(2013).Total transfer capability of transmission line cross-section with considering power constraints.Shenyang Gongye Daxue Xuebao/Journal of Shenyang University of Technology,35(2),133-138.
MLA Liang L.-K.,et al."Total transfer capability of transmission line cross-section with considering power constraints".Shenyang Gongye Daxue Xuebao/Journal of Shenyang University of Technology 35.2(2013):133-138.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace