CORC  > 山东大学
Prediction and measurement of groundwater flow rate of underground crude oil storage caverns
Wang, Zhe-Chao; Li, Shu-Cai; Liang, Jian-Yi; Qiao, Li-Ping; Xue, Yi-Guo; Zhou, Yi
刊名Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering
2014
卷号36期号:8页码:1490-1497
关键词Discrete characteristic Field measurement Finite element method Groundwater flow rate Joint Permeability coefficient Rock engineering Spatial distribution Underground crude oil storage cavern
DOI10.11779/CJGE201408015
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4797987
专题山东大学
作者单位Geotechnical and Structural Engineering Research Center, Shandong University, Jin
推荐引用方式
GB/T 7714
Wang, Zhe-Chao,Li, Shu-Cai,Liang, Jian-Yi,et al. Prediction and measurement of groundwater flow rate of underground crude oil storage caverns[J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,2014,36(8):1490-1497.
APA Wang, Zhe-Chao,Li, Shu-Cai,Liang, Jian-Yi,Qiao, Li-Ping,Xue, Yi-Guo,&Zhou, Yi.(2014).Prediction and measurement of groundwater flow rate of underground crude oil storage caverns.Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,36(8),1490-1497.
MLA Wang, Zhe-Chao,et al."Prediction and measurement of groundwater flow rate of underground crude oil storage caverns".Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering 36.8(2014):1490-1497.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace