CORC  > 山东大学
Risk assessment for an underground crude oil storage facility with water-curtaining system during construction phase
Wang, Zhe-Chao; Lu, Bao-Qi; Li, Shu-Cai; Qiu, Dao-Hong; Qiao, Li-Ping; Yu, Feng; Bi, Li-Ping
刊名Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering
2015
卷号37期号:6页码:1057-1067
关键词Construction phase Containment property Fuzzy analysis Risk assessment Risk source Rock engineering Stability Underground crude oil storage cavern
DOI10.11779/CJGE201506012
URL标识查看原文
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4776700
专题山东大学
作者单位Geotechnical and Structural Engineering Research Center, Shandong University
推荐引用方式
GB/T 7714
Wang, Zhe-Chao,Lu, Bao-Qi,Li, Shu-Cai,et al. Risk assessment for an underground crude oil storage facility with water-curtaining system during construction phase[J]. Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,2015,37(6):1057-1067.
APA Wang, Zhe-Chao.,Lu, Bao-Qi.,Li, Shu-Cai.,Qiu, Dao-Hong.,Qiao, Li-Ping.,...&Bi, Li-Ping.(2015).Risk assessment for an underground crude oil storage facility with water-curtaining system during construction phase.Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering,37(6),1057-1067.
MLA Wang, Zhe-Chao,et al."Risk assessment for an underground crude oil storage facility with water-curtaining system during construction phase".Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering 37.6(2015):1057-1067.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace