Duration effect of spectrally matched ground motions on seismic demands of elastic perfectly plastic SDOFS | |
Hou, Hetao; Qu, Bing | |
刊名 | ENGINEERING STRUCTURES |
2015 | |
卷号 | 90页码:48-60 |
关键词 | Ground motion duration Ductility Hysteretic energy Seismic demands |
DOI | 10.1016/j.engstruct.2015.02.013 |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4776057 |
专题 | 山东大学 |
作者单位 | 1.Southwest Jiaotong Univ, Sichuan Prov Key Lab Seism Engn & Technol, Chengdu 610031, Peoples R China. 2.Shandong U |
推荐引用方式 GB/T 7714 | Hou, Hetao,Qu, Bing. Duration effect of spectrally matched ground motions on seismic demands of elastic perfectly plastic SDOFS[J]. ENGINEERING STRUCTURES,2015,90:48-60. |
APA | Hou, Hetao,&Qu, Bing.(2015).Duration effect of spectrally matched ground motions on seismic demands of elastic perfectly plastic SDOFS.ENGINEERING STRUCTURES,90,48-60. |
MLA | Hou, Hetao,et al."Duration effect of spectrally matched ground motions on seismic demands of elastic perfectly plastic SDOFS".ENGINEERING STRUCTURES 90(2015):48-60. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论