A Multi-method Approach for Estimating the Failure Depth of Coal Seam Floor in a Longwall Coal Mine in China | |
Yin, Huiyong; Lefticariu, Liliana; Wei, Jiuchuan; Zhu, Lu; Guo, Jianbin; Li, Zhongjian; Guan, Yunzhang | |
刊名 | Geotechnical and Geological Engineering
![]() |
2016 | |
卷号 | 34期号:5页码:1267-1281 |
DOI | 10.1007/s10706-016-0006-x |
URL标识 | 查看原文 |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4701048 |
专题 | 山东大学 |
作者单位 | State Key Laboratory of Mining Disaster Prevention and Control Co-founded by Shandong Province a |
推荐引用方式 GB/T 7714 | Yin, Huiyong,Lefticariu, Liliana,Wei, Jiuchuan,et al. A Multi-method Approach for Estimating the Failure Depth of Coal Seam Floor in a Longwall Coal Mine in China[J]. Geotechnical and Geological Engineering,2016,34(5):1267-1281. |
APA | Yin, Huiyong.,Lefticariu, Liliana.,Wei, Jiuchuan.,Zhu, Lu.,Guo, Jianbin.,...&Guan, Yunzhang.(2016).A Multi-method Approach for Estimating the Failure Depth of Coal Seam Floor in a Longwall Coal Mine in China.Geotechnical and Geological Engineering,34(5),1267-1281. |
MLA | Yin, Huiyong,et al."A Multi-method Approach for Estimating the Failure Depth of Coal Seam Floor in a Longwall Coal Mine in China".Geotechnical and Geological Engineering 34.5(2016):1267-1281. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论