CORC  > 山东大学
Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring
Yu, Bin; Zhao, Jun; Xiao, Hongtian
刊名ROCK MECHANICS AND ROCK ENGINEERING
2017
卷号50期号:2页码:507-511
关键词Super-thick coal seam Longwall top coal caving Microseismic monitoring Medium-strong strata Overburden failures
DOI10.1007/s00603-016-1096-8
URL标识查看原文
公开日期[db:dc_date_available]
内容类型期刊论文
URI标识http://www.corc.org.cn/handle/1471x/4585404
专题山东大学
作者单位1.Datong Coal Mine Grp Co Ltd, Datong 037003, Peoples R China.
2.Shandong Univ Sci & Technol, Coll Min & Safety Engn,
推荐引用方式
GB/T 7714
Yu, Bin,Zhao, Jun,Xiao, Hongtian. Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring[J]. ROCK MECHANICS AND ROCK ENGINEERING,2017,50(2):507-511.
APA Yu, Bin,Zhao, Jun,&Xiao, Hongtian.(2017).Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring.ROCK MECHANICS AND ROCK ENGINEERING,50(2),507-511.
MLA Yu, Bin,et al."Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring".ROCK MECHANICS AND ROCK ENGINEERING 50.2(2017):507-511.
个性服务
查看访问统计
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。


©版权所有 ©2017 CSpace - Powered by CSpace