Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring | |
Yu, Bin; Zhao, Jun; Xiao, Hongtian | |
刊名 | ROCK MECHANICS AND ROCK ENGINEERING
![]() |
2017 | |
卷号 | 50期号:2页码:507-511 |
关键词 | Super-thick coal seam Longwall top coal caving Microseismic monitoring Medium-strong strata Overburden failures |
DOI | 10.1007/s00603-016-1096-8 |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4585404 |
专题 | 山东大学 |
作者单位 | 1.Datong Coal Mine Grp Co Ltd, Datong 037003, Peoples R China. 2.Shandong Univ Sci & Technol, Coll Min & Safety Engn, |
推荐引用方式 GB/T 7714 | Yu, Bin,Zhao, Jun,Xiao, Hongtian. Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring[J]. ROCK MECHANICS AND ROCK ENGINEERING,2017,50(2):507-511. |
APA | Yu, Bin,Zhao, Jun,&Xiao, Hongtian.(2017).Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring.ROCK MECHANICS AND ROCK ENGINEERING,50(2),507-511. |
MLA | Yu, Bin,et al."Case Study on Overburden Fracturing during Longwall Top Coal Caving Using Microseismic Monitoring".ROCK MECHANICS AND ROCK ENGINEERING 50.2(2017):507-511. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论