Case of Rock Burst Danger and Its Prediction and Prevention in Tunneling and Mining Period at an Irregular Coal Face | |
Gu, Shitan; Zhang, Wei; Jiang, Bangyou; Hu, Chengcheng | |
刊名 | Geotechnical and Geological Engineering |
2019 | |
卷号 | 37期号:4页码:2545-2564 |
DOI | 10.1007/s10706-018-00776-y |
URL标识 | 查看原文 |
公开日期 | [db:dc_date_available] |
内容类型 | 期刊论文 |
URI标识 | http://www.corc.org.cn/handle/1471x/4547000 |
专题 | 山东大学 |
作者单位 | State Key Laboratory of Mining Disaster Prevention and Control Co-founded by Shandong Province and the M |
推荐引用方式 GB/T 7714 | Gu, Shitan,Zhang, Wei,Jiang, Bangyou,et al. Case of Rock Burst Danger and Its Prediction and Prevention in Tunneling and Mining Period at an Irregular Coal Face[J]. Geotechnical and Geological Engineering,2019,37(4):2545-2564. |
APA | Gu, Shitan,Zhang, Wei,Jiang, Bangyou,&Hu, Chengcheng.(2019).Case of Rock Burst Danger and Its Prediction and Prevention in Tunneling and Mining Period at an Irregular Coal Face.Geotechnical and Geological Engineering,37(4),2545-2564. |
MLA | Gu, Shitan,et al."Case of Rock Burst Danger and Its Prediction and Prevention in Tunneling and Mining Period at an Irregular Coal Face".Geotechnical and Geological Engineering 37.4(2019):2545-2564. |
个性服务 |
查看访问统计 |
相关权益政策 |
暂无数据 |
收藏/分享 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。
修改评论